BSR Energy is looking to develop North Dairy Solar Park.  This project, if permitted, will generate approximately 49.99MWp of solar photovoltaic energy to the electricity network.

This solar park will produce enough clean renewable electricity to power 13,000 homes per year*, a saving of 13,000 tonnes CO2e!

We are undertaking extensive preliminary assessments including ecology, flood risk and land and visual assessments to minimise the environmental impact of the solar park layout on the site and surrounding area as far as possible.

The solar park will feature the latest technology from the industry, with a primary focus to maximise the yield over the given area.

* Based on an annual average domestic consumption per household (Great Britain) of 3,799 kWh. Source BEIS, Regional and Local authority electricity consumption statics 2018.

! Based on ‘Emissions associated with the generation of electricity at a power station (Electricity generation factors do not include transmission and distribution). Source BEIS, Greenhouse gas reporting: conversion factors 2019.

Location:North Dairy Farm, Pulham, Dorchester, DT2 7EA
Technology:Solar PV (Ground Mounted)
Size:49.99MWp design capacity
Land size (approx.)c. 76Ha (188 acres)
DNO:Scottish & Southern Electricity Networks (SSEN)
Land designation:Agricultural, Grade 3b/4
Contract term:Application is for 35 years
Planning submission date:26/03/2021
Planning decision:05/08/2021