Aller Langport

Home / Portfolio / Aller Langport

Aller Langport

BSR Energy is looking to develop Aller Langport Solar Park.  This project, if permitted, will export 14MW of solar photovoltaic energy to the electricity network.

This solar park will produce enough clean renewable electricity to power 4,200 homes per year, a saving of 6,000 CO² *.

The solar park will feature the latest technology from the industry, with a primary focus to maximise the yield over the given area.

* For every  5MW installed, a solar farm will power over 1,515 homes annually (based on an average annual consumption of 3,300 kWh of electricity for a house) and save 2,150 tonnes of CO2. Approximately 25 acres of land is required for every 5 megawatts (MW) of installation.
Location:Court Farm, Church Path, Aller, Langport, TA10 0QR
Technology:Solar PV (ground)
Size:14MW
Land size (approx.)40 acres
DNO:Western Power Distribution (WPD)
Land designation:Agricultural
Contract term:30 years
Planning decision:Approved
Construction start on site:Est. August 2020